The organising committee for the meeting is composed of:
| M. Davies P. Trampus F. Cazorla H. Schulz A. Miller L. Skånberg E. Sullivan F. Champigny P. Lemaitre F. Ammirato L. Becker S. Crutzen M. Bieth U. von Estorff B. Seysener | IAEA IWG LMNPP Chairman IAEA Division of Nuclear Power and Fuel Cycle IAEA Division of Nuclear Installation Safety OECD NEA CSNI PWG3 Chairman OECD NEA CSNI PWG3 Scientific Secretary NRWG Task Force on NDT qualification Chairman NRC ENIQ Chairman ENIQ Network Manager EPRI NDE Center Vice President EPRI NDE Center, PDI JRC Conference Chairman JRC local organisation, NDE Sector Head JRC local organisation, Scientific Secretary JRC Information and Marketing Unit IAM, responsible for local organisation |
The International Specialists Meeting on NDE Techniques Capability Demonstration and Inspection Qualification was organised on March 11-13, 1997 by EC JRC IAM. This conference was intended to provide an international forum for the discussion of recent developments, results and experience with NDE techniques capability demonstration and inspection qualification methods.
Held under the auspices of the EC, OECD and the IAEA, it brought together 115 participants from the academic, research and industrial communities, 21 countries were represented, and a total of 40 presentations were given.
The meeting provided an opportunity to compare and assess the qualification principles as proposed or applied by the American Performance Demonstration Initiative, the European Network on Inspection Qualification and the IAEA in its proposed guidelines specific to WWER's.
The meeting addressed, in terms of state of the art, the capability demonstration of NDE procedures applied to the major nuclear reactor components. Special emphasis was placed on NDE techniques qualification to detect and size flaws in order to assure structural integrity during plant design life or beyond.
National positions or experience were presented showing the typical variety of applications of one or two general principles or methodologies in agreement with national legal and traditional aspects.
Experience developed by national qualification bodies and by pilot studies were rich in information concerning the difficulties which were encountered during the studies.
Risk Based Inspection concepts were explained due to their relevance with the setting of the ISI objectives and therefore the level of qualification required for each situation considered.
Several subjects were not fully developed which are, however, of importance in the qualification process: more meetings are expected to be organised on test assemblies fabrication, defect simulations and implantation, models application, qualification trials evaluation, etc.
The meeting was successful not only in view of the large attendance for such a specialists meeting, but also for its industrial relevance and the involvement of the participants in the discussion inside and outside the meeting room.
On behalf of the Organising Committee we gratefully acknowledge all those who have by their presence, their enthusiasm and the scientific work they presented, contributed to the success of the conference.
| page | |
| Foreword | lll |
| Opening remarks JRC
K. Törrönen | 1 |
| Opening remarks IAEA
P. Trampus | 2 |
| Opening remarks OECD
A. Miller | 5 |
| Background for Inspection Qualification
S. Crutzen | 6 |
| Appendix Vlll and implementation by PDI
L. Becker | 8 |
| U.S. Performance Demonstration Initiative - Lessons learned
L. Becker | 19 |
| The European Methodology for qualification of NDT as developed
by ENIQ F. Champigny, U. Sandberg, J. Whittle, G.Engl, S. Crutzen and P. Lemaitre | 24 |
| The IAEA Guidelines preparation for the qualification of WWER reactor components ISI
F. Cazorla | 37 |
| U.S. NRC Perspective on Performance Demonstration of US Testing Systems
E. Sullivan, R. Hermann, D. Terao, D. Naujock | 44 |
| German process of qualification
M. Hansch,W. Hesselmann, R. Heumüller, A. Seibold | 49 |
| Necessary steps for Inspection Qualification in France
F. Champigny, R. Tomasino | 55 |
| Regulatory views on the strategy followed in Belgium to
qualify NDT systems
P. Mignot, D. Moussebois, G. Hennaut, C. Roubens | 64 |
| Qualification process initiatives in Spain
A. Sala SQC - Organisation and experiences from qualification | 74 |
| of NDE systems
L. Gomersson | 87 |
| Adding value by Inspection Qualification
C. Waites, J. Whittle | 91 |
| Qualification approach adopted so far in Switzerland
W. Neumann | 97 |
| Nordtest guidelines on validation, performance description
and comparison of NDE techniques (Abstract)
O. Forli | 102 |
| ISI effectiveness improvement of WWER type primary
circuit components
L. Horacek, J. Zdarek | 103 |
| PDI experience and Primary Piping ISI Qualification in the USA
L. Becker | 111 |
| Belgian response to ASME Xl requirements M. Lepiece, J-P. Lietard | 125 |
| Status of the ENIQ Pilot Study
P. Lemaitre, B. Eriksen, J. Whittle | 130 |
| A successful PDI RPV examination qualification:
Preparations, technical approach and results
B. Jacobs, W. Clayton | 142 |
| Case study of qualification of remote automated ultrasonic
inspection of austenitic pipe weld
R. Booler, R. Owen, R. Chapman | 150 |
| Recent experiences of qualification performed by TRC
T. Sjö | 158 |
| Capability demonstration of inspection techniques for primary piping of Loviisa NPP using a blind test block assembly R. Paussu, P. Särkiniemi | 163 |
| Reactor vessel bottom head penetration performance
demonstration
A. Bernard, A. Thomas | 169 |
| Validating Eddy Current array probes for inspecting
steam generator tubes
S. Sullivan, V. Cecco, L. Obrutsky, J. Lakhan, A. Park | 177 |
| Qualification of radiographic technique
L. Hammer | 185 |
| Technical justification programme of Tecnatom
to qualify ISI procedures and systems
G. Bollini | 190 |
| Approaches for the validation of the testing methods in general
applied to NDE
C. Nockemann, C. Bellon, G. Tillack, S. Nickisch | 196 |
| Qualiffcation and certification of NDT personnel from NPPs
in accordance with EN 473
N. Volkova, A. Mullin | 211 |
| Type of testing accreditation from the point of view of an
application-oriented scientific instituto
S. Kraus, R. Brinette | 225 |
| Status of Eddy Current inspection for steam generator tubes
in Korean NPP
Y. Cheong | 230 |
| Satety significance of AUGUR-4.2 on-site application
during expert ISI
A. Arjaev, S. Bougaenko | 251 |
| Assessment of the deterioration of concrete in NPP
- Causea, effects and investigative methods
P.Shaw,A.Xu | 260 |
| Improvement of NDE approaches and techniques at Ukrainian NPPs V. Kovyrshin, N. Zaritsky, O. Zinchenko | 269 |
| ENIQ Task 4: Risk Based Inspection
O. V. Chapman | 275 |
| Risk-based inspection in the US
F. Ammirato | 279 |
| Summary of the discussion
S. Crutzen | 287 |
| Conclusion of the meeting
S. Crutzen | 291 |
| List of participants | 293 |
| |NDTnet | |