where expertise comes together - since 1996 -
Conference Proceedings, Articles, News, Exhibition, Forum, Network and more
Top 20 Posts (replies)last 30 days the confusion on Omniscan SX (17) Select: the confusion on Omniscan SX (17) PAUT Calibration Difficulty With Notch F... (14) Phased Array vs RT (10) 45 degree probe calibration (9) panametrics videoscan tranducers (8) UT angle probe selection (7) Eddy current restrictions (7) how to design the calibration block for ... (5) TFM limitations (5) UT Calibration using (mm dia. ERG) (5) PT electrostatic developer (5) Physical meaning of wave dispersion (5) Influence of pulse frequency on measurem... (5) a beautiful PAUT s scanning image (5) EPOCH650 olympus VS USM36GE (5) Why two Gauss meter show to much differe... (5) CALIBRATION PROCEDURE FOR CALIBRATION BL... (4) Welding Neck Flanges Scanning Plan (4) Inspection of ss welds using manual UT c... (4) ASME Sec V, NDE Level II and III Recerti... (4)
Top 20 Posts (views) last 30 days NDT Technician (1166) Select: NDT Technician (1166) NDT Technician (1055) PAUT Calibration Difficulty With Notch F... (867) the confusion on Omniscan SX (742) Phased Array vs RT (727) Advanced NDT Inspectors (719) NDT technician (715) Inspectors (654) URGENT REQUIREMENT FOR PCN/ISO 9712/SNT-... (639) Urgent Requirement for PAUT operators (637) Urgent requirement of UT Technician (627) PCN NDT Technician (585) Immediate Requirement Of ASNT NDT Level ... (576) NDT PT LEVEL II (561) Vacancy for NDT Level III (543) Vacancy for Radiographer (BARC Level-I) (484) Long Term-RSO (479) Immediate Requirement For Asset Integrit... (469) Immediate Requirement for Multi NDT Tec... (466) ARAMCO approved UT, UT-TKY, RTFI and PAU... (460)