Career Discussions
Chuck Davis
,
Mexico, Joined May 2016, 12

Chuck Davis

,
Mexico,
Joined May 2016
12
18:01 Jul-09-2016
Typical list of consumables for AUT job for 48" pipe

Does anyone have a list of what the consumables would be for a PipeWizard for a 48" pipeline, for about
one year? Things such as gel, transducer replacements, etc.

 
 Reply 
 
Anmol Birring
Consultant,
Birring NDE Center, Inc., USA, Joined Aug 2011, 786

Anmol Birring

Consultant,
Birring NDE Center, Inc.,
USA,
Joined Aug 2011
786
19:03 Jul-09-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 18:01 Jul-09-2016 (Opening).

Other than wedges that need replacement anything can happen with mechanical equipment. And it depends on how critical the job is and how long you wait for replacement parts for shipping and clear customs. For the most critical job which is pipe lay, a full spare system is needed. For onshore, it will be as needed from the supplier but you should have some spares related to scanner, spring fixtures in scanner, encoder etc.

 
 Reply 
 
Chuck Davis
,
Mexico, Joined May 2016, 12

Chuck Davis

,
Mexico,
Joined May 2016
12
00:37 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Anmol Birring at 19:03 Jul-09-2016 .

Thanks. That helps. Trying set a budget for a pretty big onshore job with AUT Phased Array and TOFD.
Any tips are appreciated.

 
 Reply 
 
Joe Buckley
Consultant, ASNT L-III, Honorary Secretary of BINDT
Level X NDT, BINDT, United Kingdom, Joined Oct 1999, 526

Joe Buckley

Consultant, ASNT L-III, Honorary Secretary of BINDT
Level X NDT, BINDT,
United Kingdom,
Joined Oct 1999
526
01:04 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 00:37 Jul-10-2016 .

Having previously been on the other end of this kind of question many times when I was quoting customers at Sonatest, I would echo Anmols comments.

Be very realistic about what your supplier can provide. Anything that will wear out or is easily damaged like cables you should hold yourself, anything else that could fail, or get lost in shipment... Think very hard about where you can get a replacement, and how quickly. And what that loss of time would cost.

 
 Reply 
 
Anmol Birring
Consultant,
Birring NDE Center, Inc., USA, Joined Aug 2011, 786

Anmol Birring

Consultant,
Birring NDE Center, Inc.,
USA,
Joined Aug 2011
786
03:13 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 00:37 Jul-10-2016 .

If you have only one system and you have pretty big job, then this is is most likely scenario.

Something bad will happen in the first 60 days and your system will be dead.
After that you will be on the phone with the manufacturer trying to figure what happened ? that is assuming it is not a weekend.
Then the manufacturer will ship parts. They will then get stuck in the customs. You will be down for a week and your client would have lost all his/her patience and extremely upset.

So, my advise is to get a spare.

This is what I would recommend. You should first order one system, run tests in your shop for at least 30 days so you are thoroughly familiar with the operation.
Once the job starts, order the 2nd system. That way you have some cash flow. Moreover in case of emergency, the manufacturer will be more willing to ship you his spares if you have a system that is on order.

Anyway, these systems are custom made and not like a Toyota or Mercedes.

 
 Reply 
 
massimo carminati
Consultant, AUT specialist
IMG Ultrasuoni Srl, Italy, Joined Apr 2007, 691

massimo carminati

Consultant, AUT specialist
IMG Ultrasuoni Srl,
Italy,
Joined Apr 2007
691
07:13 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 18:01 Jul-09-2016 (Opening).

I think it is a mandatory decision to address a job with a complete PW as a spare unit. If you have any failure which is not just immediately managed with standard spares, then you are in trouble.

 
 Reply 
 
Steven Doc
Other, Quality Manager
Siemens Energy, Egypt, Joined Feb 2011, 187

Steven Doc

Other, Quality Manager
Siemens Energy,
Egypt,
Joined Feb 2011
187
08:42 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 00:37 Jul-10-2016 .

My advice would be to hire an experienced consultant to work with you on your quote with a view to the same person Project Managing the scope if awarded. Some of the questions asked would lead me to think you may be a little out of your depth on the AUT and thus could make a mess of the quote causing untold harm to organisations and reputations.

 
 Reply 
 
Steven Doc
Other, Quality Manager
Siemens Energy, Egypt, Joined Feb 2011, 187

Steven Doc

Other, Quality Manager
Siemens Energy,
Egypt,
Joined Feb 2011
187
10:09 Jul-10-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 00:37 Jul-10-2016 .

My advice would be to hire an experienced consultant to work with you on your quote with a view to the same person Project Managing the scope if awarded. Some of the questions asked would lead me to think you may be a little out of your depth on the AUT and thus could make a mess of the quote causing untold harm to organisations and reputations.

 
 Reply 
 
Rick
NDT Inspector, API-510 Inspector / NDT Technician
Contractor, Australia, Joined May 2012, 18

Rick

NDT Inspector, API-510 Inspector / NDT Technician
Contractor,
Australia,
Joined May 2012
18
05:14 Jul-12-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to Chuck Davis at 18:01 Jul-09-2016 (Opening).

Hi chuck
Considering the diameter and a one year duration, everything that touches the pipe will need to be replaced at least 4 times, PA wedges, tofd wedges, bands, idler wheels etc.
The 2nd system mentioned is essential so you can continue to scan welds while you repair the first "broken" system.
You will then have "spare" PA transducers and ToFD in your spare system, but I would recommend to have almost a third system ready in spare parts...
I hope this helps.
Cheers
Rick baek PWZ operator

 
 Reply 
 
Mehreen Haddad
USA, Joined Jul 2016, 1

Mehreen Haddad

USA,
Joined Jul 2016
1
07:46 Jul-12-2016
Re: Typical list of consumables for AUT job for 48" pipe
In Reply to massimo carminati at 07:13 Jul-10-2016 .

This is the best concept to sell and perches a Dubai's best bloggers or website so you can buy the product and gain a lot of profit.

 
 Reply 
 

Product Spotlight

IntraPhase Athena Phased Array System

The Athena Phased Array system, manufactured by WesDyne NDE Products & Technology, consists of a pha
...
sed array acquisition system and PC running IntraSpect software. A PC is used to perform acquisition, analysis and storage of the data. System hardware is capable of operating up to four data sets with any combination of phased array or conventional UT probes. NOW AVAILABLE IN 64-64 CONFIGURATION.
>

HARDNESS TESTER TKM-459CE combi

TKM-459CE combi applies 2 methods of hardness control: UCI and Leeb. It provides high-accuracy tes
...
ting of metals and alloys as well as items of different sizes and configurations, their hardened layers and galvanic coatings. Device represents results in HB, HRC, HV and others. Shock-, dust- and water-proof housing with intuitive software make this gauge easy to use in all working conditions.
>

MIZ®-21C: Truly Affordable Eddy Current Handheld with Surface Array Capability

Introducing MIZ-21C, the first truly affordable handheld eddy current instrument with surface array
...
capabilities. MIZ-21C can deliver fast, accurate inspections in demanding NDT applications including aerospace, oil and gas, manufacturing, and power generation. The surface array solution can reduce inspection time by up to 95% compared to traditional handheld pencil probes. The ergonomic design, long battery life, and intuitive touchscreen mean you can inspect more areas faster than ever without fatigue.
>

HD-CR 35 NDT Computed Radiography System

Portable high-resolution CR scanner for all radiography applications - weld testing, profile images
...
and aerospace. No matter what type of radiographic testing you are performing, the unique TreFoc Technology of the HD-CR 35 NDT imaging plate scanner always guarantees the highest image quality.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window