where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -

Materials Research Institute
Consulting to the NDT industry.
604 views
Technical Discussions
SHANKAR ARUMUGAM
Other, NDE Engineer
India, Joined Oct 2013, 39

SHANKAR ARUMUGAM

Other, NDE Engineer
India,
Joined Oct 2013
39
07:00 Dec-29-2016
PT Demonstration - reg

Dear Friends,

When performing Liquid Penetrant Examination demonstration, is it required to establish the maximum drying time after Surface Preparation (precleaning before penetrant application)?

If I fixed minimum drying time required after Surface preparation as 1 minute, is it required to repeat a demo for maximum drying time after surface preparation?

 
 Reply 
 
Eswaran
Singapore, Joined Mar 2013, 25

Eswaran

Singapore,
Joined Mar 2013
25
01:46 Jan-02-2017
Re: PT Demonstration - reg
In Reply to SHANKAR ARUMUGAM at 07:00 Dec-29-2016 (Opening).

Yes you have to establish Minimum & Maximum drying time , Eg You wish to demonstrate Minimum one minute to Maximum 10 minute , Demonstrate one Minute drying time & 10 Minute drying time , It will cover 1 minute to 10 minutes drying time.
Regards
S.Eswaran

 
 Reply 
 

Product Spotlight

Eddy Current inspection : RotoETscan Rotating Head

The rotating head RotoETscan detects the presence of longitudinal surface or sub surface defects a
...
t high speed. The rotating head is often installed directly on the production line. It is generally dedicated to the control of long products such as tubes, bars and wires, made of ferrous or non-ferrous material. It can also be used for inspection of small parts (billets).
>

IntraPhase Athena Phased Array System

The Athena Phased Array system, manufactured by WesDyne NDE Products & Technology, consists of a pha
...
sed array acquisition system and PC running IntraSpect software. A PC is used to perform acquisition, analysis and storage of the data. System hardware is capable of operating up to four data sets with any combination of phased array or conventional UT probes. NOW AVAILABLE IN 64-64 CONFIGURATION.
>

Research Center IDEKO develops an ultrasonic train wheel inspection system for CAF

The Basque Research centre IK4-IDEKO has developed a state-of-the-art ultrasonic inspection system f
...
or the train wheel. This system secures a sound condition of train wheels and is thus a significant contribution to rail transport safety. The device was delivered to CAF recently and its use allows the manufacturer to become an approved supplier of rolling stock in Italy, as it meets the demanding homologation standards of this country. \\\\r\\\\n
>

Customized Probes and Transducers

With a strong development department and our own piezocomposite production, we accompany you from th
...
e first product idea to serial production. Our scientists are continuously researching new methods in the field of ultrasonic measurement technology. The progress achieved enables us to offer you optimal solutions.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window