scottie
scottie
08:50 Mar-04-2008
code case 181, 2359

Can anyone explain to me where lvl II stand now. As the case states all final data interpretation shall be done by a LVL III, what is the pint in having us LVL II on site if we cant sentence the data. Does this mean that we all have to get LVL III to carry on working


    
 
 Reply 
 
mj
mj
01:17 Mar-04-2008
Re: code case 181, 2359
----------- Start Original Message -----------
: Can anyone explain to me where lvl II stand now. As the case states all final data interpretation shall be done by a LVL III, what is the pint in having us LVL II on site if we cant sentence the data. Does this mean that we all have to get LVL III to carry on working
------------ End Original Message ------------

level II can collect the data and make a overall onsite interpretation, but final review and acceptance from Level III. its realy appricated to go for like that way. because 1.high skills required for TOFD interpreation, that a short experiance level II can't do
2. atleast 2 people should interpretate the data (Most of the End client don't know how to interpretate like Radiography


    
 
 Reply 
 
scottie
scottie
01:31 Mar-04-2008
Re: code case 181, 2359
but surely if lvlIII is reviewing, and on one site u may have 5 or more ToFd crews that this will just prolong getting the results, and in answer to the other part i know more lvl II with much more experience than a lvl II so would a better intrepretation or wording be that the final analysis is performed by someone with for example 4 yrs experience

------- Start Original Message -----------
: : Can anyone explain to me where lvl II stand now. As the case states all final data interpretation shall be done by a LVL III, what is the pint in having us LVL II on site if we cant sentence the data. Does this mean that we all have to get LVL III to carry on working
: level II can collect the data and make a overall onsite interpretation, but final review and acceptance from Level III. its realy appricated to go for like that way. because 1.high skills required for TOFD interpreation, that a short experiance level II can't do
: 2. atleast 2 people should interpretate the data (Most of the End client don't know how to interpretate like Radiography
------------ End Original Message ------------




    
 
 Reply 
 
Nigel Armstrong
Engineering, - Specialist services
United Kingdom, Joined Oct 2000, 1096

Nigel Armstrong

Engineering, - Specialist services
United Kingdom,
Joined Oct 2000
1096
02:29 Mar-04-2008
Re: code case 181, 2359
Clause (j) of both Code Case 181 for ASME B31 Code for Pressure Piping and Code Case 2235-9 for ASME BPV Code only calls for REVIEW by a Level III when the data analysis and interpretation has been carried out by a proprly-qualified level II. Earlier in both documents clause (f) states "Only Level II or III personnel shall analyze the data or interpret the results". No restriction is placed on properly-qualified Level II techs. Its a REVIEW only to ensure that all data is present. The following paragraph does give the option of a final interpretation and evaluation by a Level III after initial acquisition and interpretation by a qualified level II. I cannot see many contractors accepting to go down this route.

Pragmatically, I dont think there is any likelihood of all such work going to level III personnel only. GHow about anyone else?


----------- Start Original Message -----------
: Can anyone explain to me where lvl II stand now. As the case states all final data interpretation shall be done by a LVL III, what is the pint in having us LVL II on site if we cant sentence the data. Does this mean that we all have to get LVL III to carry on working
------------ End Original Message ------------




    
 
 Reply 
 
scottie
scottie
03:43 Mar-04-2008
Re: code case 181, 2359
I agree with what you are saying but unfortunately some people that are now supposedly experts and working for plant owners, insist that the final analysis is carried out by a lvl III this has to be addressed by the board at ASME

----------- Start Original Message -----------
: Clause (j) of both Code Case 181 for ASME B31 Code for Pressure Piping and Code Case 2235-9 for ASME BPV Code only calls for REVIEW by a Level III when the data analysis and interpretation has been carried out by a proprly-qualified level II. Earlier in both documents clause (f) states "Only Level II or III personnel shall analyze the data or interpret the results". No restriction is placed on properly-qualified Level II techs. Its a REVIEW only to ensure that all data is present. The following paragraph does give the option of a final interpretation and evaluation by a Level III after initial acquisition and interpretation by a qualified level II. I cannot see many contractors accepting to go down this route.
: Pragmatically, I dont think there is any likelihood of all such work going to level III personnel only. GHow about anyone else?
:
: : Can anyone explain to me where lvl II stand now. As the case states all final data interpretation shall be done by a LVL III, what is the pint in having us LVL II on site if we cant sentence the data. Does this mean that we all have to get LVL III to carry on working
------------ End Original Message ------------




    
 
 Reply 
 

Product Spotlight

Research and Applications Development For NDT

The Research and Applications Development (RAD) group is a newly formed team within Acuren dedicat
...
ed to tackling challenging inspection problems. Our focus is the development of novel, field deployable, advanced inspection techniques for use in cases where standard NDT methods are ineffective. We don't wait for new innovations, we engineer them. From concept to commissioning.
>

Silverwing RMS PA - Phased-array corrosion mapping

Eddyfi Technologies integrated two market leading solutions, Silverwing’s RMS and M2M’s instru
...
ments to provide a high-speed, remote access ultrasonic phased-array inspection system with live total focusing method (TFM).
>

YXLON Cougar EVO

Scalable small footprint X-ray inspection systems for assembly and laboratory applications. The
...
YXLON Cougar EVO series was designed to provide the "best-in- class" inspection solutions for SMT, semiconductor, and laboratory assembly applications, while maintaining a small system footprint for maximum convenience. With optimized software and hardware, these systems produce higher quality and more consistent results than other electronics inspection systems currently on the market.
>

TOPAZ® 64: Fully Integrated Portable 32 or 64 Channel PAUT Instrument with FMC & TFM

Introducing TOPAZ64, the industry’s most intelligent fully integrated, portable 32 or 64-channel
...
phased array ultrasound (UT) instrument. TOPAZ64 combines code-compliant phased array UT with the industry’s most advanced full matrix capture (FMC) and total focusing method (TFM) capabilities. Featuring the highest acquisition frequency in its class, high resolution FMC and a 12” multi-touchscreen, users can easily visualize even the smallest flaws. TOPAZ64 can generate a bipolar pulse that provides more acoustic energy versus previous models for punching through thick components. The result is a portable tool that delivers increased inspection coverage, more accurate signals, and the ability to handle all UT inspections in one package. TOPAZ64 is ideal for challenging applications in transportation, oil and gas, manufacturing and power generation.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window