Shibu T James
Shibu T James
02:56 Sep-10-2008
100% RT on process piping

Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?


 
 Reply 
 
Nigel Armstrong
Engineering, - Specialist services
United Kingdom, Joined Oct 2000, 1096

Nigel Armstrong

Engineering, - Specialist services
United Kingdom,
Joined Oct 2000
1096
05:53 Sep-10-2008
Re: 100% RT on process piping
Hi Shibu

Code B31.3. requires 100% RT under severe cyclic conditions and for Chapter IX, High Pressure Piping.

Your 2nd sentence should bear a warning as it falls short of the total requirements for closure (golden) welds, para 345.9, and also the conditions under which hydrotest may be omitted, para. 345.1(c). There is also a requirement for flexibility analysis and senstitive leak test plus any further Owner-imposed requirements such as in-process examination.

You ask when "we can request" 100% RT. Do you mean the Owner as defined by ASME? If its not a specific Code requirement as in the case of normal fluid service (5% random RT), but the Owner wants the extra confidence through 100% RT then this should be stipulated at the FEED stage so that there will be no "Its non-contractual so either we wont do it or we shall re-charge" from your inspection contractor.

Hope this helps

Nigel


----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping inlieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------




 
 Reply 
 
Rafal Mis
Sales, - Technical Support
Olympus Poland, Poland, Joined Sep 2008, 12

Rafal Mis

Sales, - Technical Support
Olympus Poland,
Poland,
Joined Sep 2008
12
08:25 Sep-11-2008
Re: 100% RT on process piping
----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------

I'd like to put in the picture UT of pipes instead of RT. Some companies accept special IBUS-TD method for UT of thin pipe welds. This method in very sensitive, reliable and is much cheaper than RT. If this post gave you any help than please write to me for additional informations.


 
 Reply 
 
John O'Brien
Consultant, -
Chevron ETC , USA, Joined Jan 2000, 280

John O'Brien

Consultant, -
Chevron ETC ,
USA,
Joined Jan 2000
280
03:45 Sep-11-2008
Re: 100% RT on process piping
----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------

The ASME Codes are a minimum set of standard requirements and should always be part of a wider engineering set of specifications developed by the owner to fully cover the intended application. The owner can always increase the required degree or type of examination above the minimum code requirements its just a question of are you willing to pay for it. Remember its often not just the cost of examination that contractors may want to recover they may want to increase their allowance for re-work especially on lump sum jobs to allow for the fact that the increased examination may find more items requiring repair.


 
 Reply 
 
Ed T.
Ed T.
03:12 Sep-12-2008
Re: 100% RT on process piping
I have been pon projects where the final welds or "Golden Welds" get 100% RT in lieu of hydrotesting. I have also seen situations where we were tying into an existing line. The owner was concerned the existing line was old and may not take the hydrotest pressure so we would perform 100% RT in lieu of hydro.
This is awlway agreed to before the work is perfomed though.

----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------




 
 Reply 
 
fadhilhasb
fadhilhasb
07:33 Jul-07-2017
Re: 100% RT on process piping
In Reply to Shibu T James at 02:56 Sep-10-2008 (Opening).

In ASME B31.4 or B31.8. That have statement show when perform 100% RT for piping can waive Hydrotest requirement?

 
 Reply 
 
Steven Doc
Other, Quality Manager
Siemens Energy, Egypt, Joined Feb 2011, 187

Steven Doc

Other, Quality Manager
Siemens Energy,
Egypt,
Joined Feb 2011
187
17:49 Jul-10-2017
Re: 100% RT on process piping
In Reply to fadhilhasb at 07:33 Jul-07-2017 .

Personally I would not accept RT in lieu of Hydrotest. They are completely different examinations resulting in completely different outputs.

100% RT only tells us if the welder has performed to pre determined workmanship standards, it tells zero about the integrity of the weld.

 
 Reply 
 

Product Spotlight

MUSE Mobile Ultrasonic Equipment

The MUSE, a portable ultrasonic imaging system, was developed for in-field inspections of light-weig
...
ht structures. The MUSE consists of a motor-driven manipulator, a water circulation system for the acoustic coupling and a portable ultrasonic flaw detector (USPC 3010). The MUSE provides images of internal defects (A-, B-,C- and D-scan).
>

EKOSCAN Phased Array

In order to always fit your needs, EKOSCAN can manufacture any type of UT transducer, either convent
...
ional or Phased Array. As an ISO 9001: 2015 certified company, EKOSCAN is extremely careful as far a material selection and manufacturing processes are concerned. Our probes guarantee our customers the benefits of latest innovations regarding piezo-composite, backing, impedance adaptation layer, etc. Specific probes for hostile environment: high temperature, high pressure, corrosive environment,etc. Specific probes designed to fit your specific application: optimization of every parameter to guarantee you the best detection.
>

High-end Ultrasonic Flaw Detector with 32:128PR PAUT and 2-ch TOFD: SyncScan 2

SIUI’s newly launched SyncScan 2, is a high-end ultrasonic flaw detector with 32:128PR PAUT and
...
2-ch TOFD, which can maximize your efficiency for PA and TOFD. ● Support PA/TOFD/UT ● 32-ch PA is more suitable for inspection on extra-thick wall and high-attenuation material. ● 32-ch PA and 2-ch TOFD work simultaneously. ● Support PR mode for corrosion inspection.
>

AMIGO2

TSC Amigo2 - ACFM technology has developed a solid reputation for accurately detecting and sizing
...
surface-breaking cracks through paint and coatings. As the industry demands increased performance in speed, signal quality, and portability, it’s time for an evolution. It’s time for Amigo2.
>