Shibu T James
Shibu T James
02:56 Sep-10-2008
100% RT on process piping

Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?


 
 Reply 
 
Nigel Armstrong
Engineering, - Specialist services
United Kingdom, Joined Oct 2000, 1096

Nigel Armstrong

Engineering, - Specialist services
United Kingdom,
Joined Oct 2000
1096
05:53 Sep-10-2008
Re: 100% RT on process piping
Hi Shibu

Code B31.3. requires 100% RT under severe cyclic conditions and for Chapter IX, High Pressure Piping.

Your 2nd sentence should bear a warning as it falls short of the total requirements for closure (golden) welds, para 345.9, and also the conditions under which hydrotest may be omitted, para. 345.1(c). There is also a requirement for flexibility analysis and senstitive leak test plus any further Owner-imposed requirements such as in-process examination.

You ask when "we can request" 100% RT. Do you mean the Owner as defined by ASME? If its not a specific Code requirement as in the case of normal fluid service (5% random RT), but the Owner wants the extra confidence through 100% RT then this should be stipulated at the FEED stage so that there will be no "Its non-contractual so either we wont do it or we shall re-charge" from your inspection contractor.

Hope this helps

Nigel


----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping inlieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------




 
 Reply 
 
Rafal Mis
Sales, - Technical Support
Olympus Poland, Poland, Joined Sep 2008, 12

Rafal Mis

Sales, - Technical Support
Olympus Poland,
Poland,
Joined Sep 2008
12
08:25 Sep-11-2008
Re: 100% RT on process piping
----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------

I'd like to put in the picture UT of pipes instead of RT. Some companies accept special IBUS-TD method for UT of thin pipe welds. This method in very sensitive, reliable and is much cheaper than RT. If this post gave you any help than please write to me for additional informations.


 
 Reply 
 
John O'Brien
Consultant, -
Chevron ETC , USA, Joined Jan 2000, 280

John O'Brien

Consultant, -
Chevron ETC ,
USA,
Joined Jan 2000
280
03:45 Sep-11-2008
Re: 100% RT on process piping
----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------

The ASME Codes are a minimum set of standard requirements and should always be part of a wider engineering set of specifications developed by the owner to fully cover the intended application. The owner can always increase the required degree or type of examination above the minimum code requirements its just a question of are you willing to pay for it. Remember its often not just the cost of examination that contractors may want to recover they may want to increase their allowance for re-work especially on lump sum jobs to allow for the fact that the increased examination may find more items requiring repair.


 
 Reply 
 
Ed T.
Ed T.
03:12 Sep-12-2008
Re: 100% RT on process piping
I have been pon projects where the final welds or "Golden Welds" get 100% RT in lieu of hydrotesting. I have also seen situations where we were tying into an existing line. The owner was concerned the existing line was old and may not take the hydrotest pressure so we would perform 100% RT in lieu of hydro.
This is awlway agreed to before the work is perfomed though.

----------- Start Original Message -----------
: Can you help me? 100% RT required for process piping in lieu of hydro test, do you know any other circumstances we can request for 100% RT for butt weld joints?
------------ End Original Message ------------




 
 Reply 
 
fadhilhasb
fadhilhasb
07:33 Jul-07-2017
Re: 100% RT on process piping
In Reply to Shibu T James at 02:56 Sep-10-2008 (Opening).

In ASME B31.4 or B31.8. That have statement show when perform 100% RT for piping can waive Hydrotest requirement?

 
 Reply 
 
Steven Doc
Other, Quality Manager
Siemens Energy, Egypt, Joined Feb 2011, 187

Steven Doc

Other, Quality Manager
Siemens Energy,
Egypt,
Joined Feb 2011
187
17:49 Jul-10-2017
Re: 100% RT on process piping
In Reply to fadhilhasb at 07:33 Jul-07-2017 .

Personally I would not accept RT in lieu of Hydrotest. They are completely different examinations resulting in completely different outputs.

100% RT only tells us if the welder has performed to pre determined workmanship standards, it tells zero about the integrity of the weld.

 
 Reply 
 

Product Spotlight

NEW - TD Focus-ScanRX

The NEW Next Generation Advanced UT platform, TD Focus ScanRX - Also available as a card stack solut
...
ion. Key Improvements 1. Data acquisition is significantly faster than current design 2. Better aesthetic – closely aligns with HandyScan RX 3. Improved IP rating (Target IP66) 4. Ruggedized housing 5. Connectors are protected from impact and ingress 6. Integrated stand and separate retractable handle easy to keep clean) 7. Touchscreen with ruggedized display glass 8. 3-Axis encoder input
>

CIVA 2020 UT Module

CIVA NDE Simulation Software is the world leader of NDT Simulation. The UT simulation Module incl
...
udes: - "Beam computation": Beam propagation simulation - "Inspection Simulation": Beam interaction with flaws or specimens The user can simulate a whole inspection process (pulse echo, tandem or TOFD) with a wide range of probes (conventional, Phased- arrays or EMAT), components, and flaws.
>

MIZ®-21C: Truly Affordable Eddy Current Handheld with Surface Array Capability

Introducing MIZ-21C, the first truly affordable handheld eddy current instrument with surface array
...
capabilities. MIZ-21C can deliver fast, accurate inspections in demanding NDT applications including aerospace, oil and gas, manufacturing, and power generation. The surface array solution can reduce inspection time by up to 95% compared to traditional handheld pencil probes. The ergonomic design, long battery life, and intuitive touchscreen mean you can inspect more areas faster than ever without fatigue.
>

Ultrasonic Squirter/Gantry System

TecScan’s NDT Ultrasonic Gantry Systems are industrial Squirter scanners designed for non-destru
...
ctive quality testing and raster scanning of large structures and parts. The Gantry Systems are usually composed of an Industrial Mechanical Scanner and a Control Room with System Workstation.
>