Transfering data from PQR to WPS

This is my first post so I will start off by saying hello to one and all!

I have just started a new job and they want me to make some WPS from their existing PQR's.
I have never done this before so am I right in assuming that I just transfer the data from the PQR to the WPS, which in turn makes the WQR?

Mark

    
 
 Reply 
 
Michel Couture
NDT Inspector,
consultant, Canada, Joined Sep 2006, 847

Michel Couture

NDT Inspector,
consultant,
Canada,
Joined Sep 2006
847
16:59 Mar-13-2009
Re: Transfering data from PQR to WPS
In Reply to Mark Milligan at 11:04 Mar-13-2009 (Opening).

Hi Mark,

I don't think I can help, but your post give me the chance to offer a little of insight to all, so I hope you will not get offended and think that I'm picking on you.

I see in your post three abbreviation: WPS, PQR, WQR. And to tell you the truth, I don't know what you are refering to except maybe with WPS which I think refer to welding!

As our world becomes more of a global economy and technical exchange coming from so many sources, this website being the prime example maybe it would be a good idea to first mention what the abbreviation means. NDT is such a vast field and I know that each sector of the industry have their accronym for diffrent techniques and tools used, its innevitable. So informing others on the meaning of those abbreviations will only help but to increase the knowledge of all.

I remember 15 years ago, one of my client was flying Airbus A330-200 and after some difficulty in the inspection of the Main Landing Gear, I was invited to the manufacturer's facility outside of London, England. It was found after technical discussion that the IIW calibration block we were using did not meet the specification of the Service Bulletin. When someone mentionned that it had to meet BS so and so, I had to ask what BS stood for. British Standard the answer came and I relpy Hum!!! This is where the confusion is, because in North America, BS means something totally different.

In closing Mark, welcome to the board. You'll find here many expert who can be of great help.

Cheerio's

    
 
 Reply 
 
bob sudharmin
Engineering, Reliability and Integrity Eng
Shell Malaysia Trading, Malaysia, Joined Jan 2008, 54

bob sudharmin

Engineering, Reliability and Integrity Eng
Shell Malaysia Trading,
Malaysia,
Joined Jan 2008
54
17:17 Mar-13-2009
Re: Transfering data from PQR to WPS
In Reply to Michel Couture at 16:59 Mar-13-2009 .

I tend to agree to the comment on the unlimited use of acronyms which would be helpful if further reference are made.
A WPS is welding procedure specification. It has to be supported by PQR which is Procedure Qualification Record. I wonder what WQR stands for?

    
 
 Reply 
 
CHP
CHP
12:10 Mar-14-2009
Re: Transfering data from PQR to WPS
In Reply to bob sudharmin at 17:17 Mar-13-2009 .

Welder Qualification Record?

    
 
 Reply 
 
zarir ramiz
, Joined ,

zarir ramiz

,
Joined

10:18 Mar-16-2009
Re: Transfering data from PQR to WPS
In Reply to Mark Milligan at 11:04 Mar-13-2009 (Opening).

ABBREVIATIONS

WPS -welding procedure specification - an approved and accepted welding procedure; an
authorised document.
PQR procedure qualification records - proof the procedure works - record of tests undertaken to qualify procedure.
WAC welder approval certificate - required to ensure a particular welder is capable of welding to a procedure.
WATC welder approval test certificate.
WAR welder approval record.
WPAR welding procedure approval record.
WQT welder qualification test.
pWPS preliminary WPS - unauthorised (contains all essential variables and, after welding the test piece and all NDT and destructive tests have been accepted, then the WPS can be approved).
Re-approval of a welding procedure is necessary if there is a change of any of the essential variables or considerable defect re-occurrence.
ESSENTIAL VARIABLES

An essential variable is a variable that will influence or change the mechanical or metallurgical properties of the welded joint - changes affecting the procedure approval. Any change in an essential variable requires a new welding procedure specification (WPS).
Essential variables include: wall thickness, joint design, process, materials, consumables, welding position, direction, heat input (voltage, amperage, travel speed), heat treatment.

    
 
 Reply 
 

Product Spotlight

High-performance Linear Phased Array Probes

Available to order from stock in a range of 5MHz – 7.5MHz and from 16 to 64 elements. Designed w
...
ith piezo-composite elements, Phoenix phased array probes provide high-resolution imaging to maximise sensitivity; accurate ultrasonic detection and sizing of defects in welds; and effective corrosion mapping. Housed in a rugged stainless steel case for on-site industrial NDT applications.
>

Silverwing RMS PA - Phased-array corrosion mapping

Eddyfi Technologies integrated two market leading solutions, Silverwing’s RMS and M2M’s instru
...
ments to provide a high-speed, remote access ultrasonic phased-array inspection system with live total focusing method (TFM).
>

ISAFE3 Intrinsically Safe Sensor System

ISAFE3 intrinsically safe sensor system of Vallen Systeme is especially targeted at the petrochemica
...
l - as well as oil and gas transportation industry. The sensor system is designed for permanent monitoring or periodic inspection tasks. Sensors are available for different AE-frequency ranges optimized for corrosion and fatigue crack detection and other applications. The ISAFE 3 sensor system consists of an AE-sensor (model ISAS3) certified according to ATEX/IEC for installation in zone 0, gas group IIC, IP68, 20 to +60 °C, and a signal isolator (model SISO3) certified for installation in zone 2. An ISAS3 sensor can be mounted in atmosphere or submerged, e.g. in water or crude oil. It is supported by mounting tools for temporary (magnets) or permanent (welded) installation. ISAFE3 supports automatic sensor coupling test and can be used with any AE signal processor supporting 28V supply at 90 mA peak, e.g. Vallen Systeme ASIP-2/A.
>

FAAST-PA! OEM Patented phased Array for high speed UT inspection

Multiangle, Multifocus, Multifrequency, Multibeam. Instead of stacking UT electronics and having m
...
any PA probes, FAAST-PA is able to transmit all delay laws within ONE single shot in Real time.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window