00:27 Sep-25-2002
ASME B&PV Secc V Art. 2 and 22

There is a possible misunderstanding in the interpretation for the appropriate IQI selection when using double wall-double image technique which states in the Art. 2 that the IQI selection has to be done based in the single wall and a sketch showing this is contained in the 95 Ed. and in the 98 Ed. Add. 2000, while in the former this was cleared in the Art. 22 (e 747) stating to be careful when exposing DW/DI there has to be selected the IQI bases in the double wall, the latter edition does not states this, probably for the respect to the original ASTM standard (the title also was changed here).
Our concern is that , being well versed in the RT technology, we consider that omitting a clear up confusess some inspectors not familiar with the RT in this special case.
We would appreciate very much if you agree with us in using the IQI based in the double wall thickness only for the DW/DI technique


 
 Reply 
 
Juan Amado
Engineering, Inspection
Arco Industrial, S.A., Panama, Joined Nov 2001, 44

Juan Amado

Engineering, Inspection
Arco Industrial, S.A.,
Panama,
Joined Nov 2001
44
00:10 Sep-27-2002
Re: ASME B&PV Secc V Art. 2 and 22
We have performed many RT inspections utilizing the DW/DI technique, and have always managed to comply with the IQI wire diameter apropiate for the single wall thickness. Furthermore, it makes sense that the IQI selection be based on the single wall thickness because since the weld being evaluated is equivalent to only one wall of the pipe, the indications to be detected must be in the range of only one wall thickness. The difficulty with the method stems from the fact that there is added distance between the side of the pipe that is far from the film thus making it more difficult to show the appropiate wire image on the radiograph. The only way to mitigate this effect is to increase the source to object distance. For tubes of 2" to 3" nominal diameter we have found a 24" to 30" source to object distance yields good results.

: There is a possible misunderstanding in the interpretation for the appropriate IQI selection when using double wall-double image technique which states in the Art. 2 that the IQI selection has to be done based in the single wall and a sketch showing this is contained in the 95 Ed. and in the 98 Ed. Add. 2000, while in the former this was cleared in the Art. 22 (e 747) stating to be careful when exposing DW/DI there has to be selected the IQI bases in the double wall, the latter edition does not states this, probably for the respect to the original ASTM standard (the title also was changed here).
: Our concern is that , being well versed in the RT technology, we consider that omitting a clear up confusess some inspectors not familiar with the RT in this special case.
: We would appreciate very much if you agree with us in using the IQI based in the double wall thickness only for the DW/DI technique
.



 
 Reply 
 

Product Spotlight

Robotic laser shearography enables 100% inspection of complex, flight-critical composite structures

An article in “Composites World Magazine” showcases Non Destructive Testing of aero-structures
...
with Laser Shearography. Over the years Dantec Dynamics has supplied many solutions for the aerospace industry. Referring to specific customer projects several of these cases are examined to outline the advantages of using Laser Shearography for automated defect detection.
>

IntraPhase Athena Phased Array System

The Athena Phased Array system, manufactured by WesDyne NDE Products & Technology, consists of a pha
...
sed array acquisition system and PC running IntraSpect software. A PC is used to perform acquisition, analysis and storage of the data. System hardware is capable of operating up to four data sets with any combination of phased array or conventional UT probes. NOW AVAILABLE IN 64-64 CONFIGURATION.
>

GUL Subsea Solutions - Screeening & Monitoring

To inspect new and existing subsea lines, you need proven technology and experience. GUL offers it's
...
technology to solve this challenge: GUL Subsea and gMAT Transducer Rings.
>

Echomac® PA Bar Tester

The Echomac® PA BT provides 100% inspection of round bars for core and surface defects, at speeds u
...
p to 2 m/sec, depending on the specific application. The unit allows producers to handle a much larger range of diameters in one installation, and is available in 3 models to test 10 – 75mm diameter (small model); 20 – 130mm (medium model) or 50 – 254mm (large model) bars.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window