where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -

910 views
Technical Discussions
Tariq
NDT Inspector,
Association sonatrach & British Petroleum & Statoil, Algeria, Joined Jun 2014, 10

Tariq

NDT Inspector,
Association sonatrach & British Petroleum & Statoil,
Algeria,
Joined Jun 2014
10
15:00 Jan-18-2017
The impact of removing excess welding metal

Hello Gents

In order to be able to have Ultrasonic reading of weld thickness over a nozzle, we removed the the Excess weld metal without touching the parent metal to have a straight contact between the UT probe and the weld metal
Question: is this removing of Excess weld metal affect negatively the integrity of equipment being tested or not

Thanks for advice me
Regards

 
 Reply 
 
Ed Ginzel
R & D, -
Materials Research Institute, Canada, Joined Nov 1998, 1304

Ed Ginzel

R & D, -
Materials Research Institute,
Canada,
Joined Nov 1998
1304
15:24 Jan-18-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Tariq, blending the excess weld cap metal to the parent metal is generally considered an improvement of the situation. Any stress riser effect at the transition is then removed. In some structures you will even find that the engineering drawings "require" removal of excess weld metal when the component is subject to cyclic loading.

 
 Reply 
 
John O'Brien
Consultant, -
Chevron ETC , USA, Joined Jan 2000, 280

John O'Brien

Consultant, -
Chevron ETC ,
USA,
Joined Jan 2000
280
02:32 Jan-20-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Reinforcement is not intended to be part of the design thickness and in many codes is supposed to be removed to aide high quality NDE so your removal should not be an issue,

 
 Reply 
 
lawrence goldberg
NDT Inspector, NDT Inspector
USA, Joined May 2013, 13

lawrence goldberg

NDT Inspector, NDT Inspector
USA,
Joined May 2013
13
15:21 Jan-23-2017
Re: The impact of removing excess welding metal
In Reply to John O'Brien at 02:32 Jan-20-2017 .

One should look at AWS D1.1 and the usage of both weld toe grinding and weld toe hammer peening lg

 
 Reply 
 
Cesar Tovar
NDT Inspector, Quality assurance Representative
Toronto Transit Commission, Mexico, Joined Sep 2014, 7

Cesar Tovar

NDT Inspector, Quality assurance Representative
Toronto Transit Commission,
Mexico,
Joined Sep 2014
7
17:35 Jan-23-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Hi Tariq,

Here Engineering ordered do not touch the Crown in order to "increase" the life for a structure under cyclic load....the main issua is lack of penetration and lack of fusión at the root...and the results shows that the structure will have 30 years guaranty ...

 
 Reply 
 

Product Spotlight

Extended Range Variable Wall® Piping Calibration Blocks for Longseam Inspection

This set of two blocks has been specially designed for situations where ultrasonic examination tak
...
es place circumferentially or “around the curve” for applications such as inspection of longseam welds in piping and vessels. Jointly designed by PH Tool and Holloway NDT, the blocks feature side-drilled hole reflectors positioned within novel compound-curves, each with multiple thickness steps. The unique design results in a light and compact form factor, with the largest block weighing just over 15 lbs and spanning just 16 ¾”. Coverage is provided for nominal pipe sizes from 6” to 10” in the small block and 12” to a whopping 56” in the large block. The compound OD curves and multiple wall thicknesses actually exceed ASME requirements, providing exceptional signal response and measurement accuracy. Properly managing beam divergence off the ID and stabilizing beam skew due to probe rocking is essential to maintaining a consistent calibration when inspecting lengthwise on curved surfaces.
>

GUL Subsea Solutions - Screeening & Monitoring

To inspect new and existing subsea lines, you need proven technology and experience. GUL offers it's
...
technology to solve this challenge: GUL Subsea and gMAT Transducer Rings.
>

NDTkit RT

NDTkit RT, TESTIA's Digital Radiography software The NDTkit product line software for X-ray analysi
...
s. NDTkit RT is a software benefiting from the Ultis kernel which is dedicated to radiographic image analysis. It offers a set of tools and filtering processes to assist RT operators in finding relevant flaws.
>

IntraPhase Athena Phased Array System

The Athena Phased Array system, manufactured by WesDyne NDE Products & Technology, consists of a pha
...
sed array acquisition system and PC running IntraSpect software. A PC is used to perform acquisition, analysis and storage of the data. System hardware is capable of operating up to four data sets with any combination of phased array or conventional UT probes. NOW AVAILABLE IN 64-64 CONFIGURATION.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top