where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -

923 views
Technical Discussions
Tariq
NDT Inspector,
Association sonatrach & British Petroleum & Statoil, Algeria, Joined Jun 2014, 10

Tariq

NDT Inspector,
Association sonatrach & British Petroleum & Statoil,
Algeria,
Joined Jun 2014
10
15:00 Jan-18-2017
The impact of removing excess welding metal

Hello Gents

In order to be able to have Ultrasonic reading of weld thickness over a nozzle, we removed the the Excess weld metal without touching the parent metal to have a straight contact between the UT probe and the weld metal
Question: is this removing of Excess weld metal affect negatively the integrity of equipment being tested or not

Thanks for advice me
Regards

 
 Reply 
 
Ed Ginzel
R & D, -
Materials Research Institute, Canada, Joined Nov 1998, 1307

Ed Ginzel

R & D, -
Materials Research Institute,
Canada,
Joined Nov 1998
1307
15:24 Jan-18-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Tariq, blending the excess weld cap metal to the parent metal is generally considered an improvement of the situation. Any stress riser effect at the transition is then removed. In some structures you will even find that the engineering drawings "require" removal of excess weld metal when the component is subject to cyclic loading.

 
 Reply 
 
John O'Brien
Consultant, -
Chevron ETC , USA, Joined Jan 2000, 281

John O'Brien

Consultant, -
Chevron ETC ,
USA,
Joined Jan 2000
281
02:32 Jan-20-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Reinforcement is not intended to be part of the design thickness and in many codes is supposed to be removed to aide high quality NDE so your removal should not be an issue,

 
 Reply 
 
lawrence goldberg
NDT Inspector, NDT Inspector
USA, Joined May 2013, 13

lawrence goldberg

NDT Inspector, NDT Inspector
USA,
Joined May 2013
13
15:21 Jan-23-2017
Re: The impact of removing excess welding metal
In Reply to John O'Brien at 02:32 Jan-20-2017 .

One should look at AWS D1.1 and the usage of both weld toe grinding and weld toe hammer peening lg

 
 Reply 
 
Cesar Tovar
NDT Inspector, Quality assurance Representative
Toronto Transit Commission, Mexico, Joined Sep 2014, 7

Cesar Tovar

NDT Inspector, Quality assurance Representative
Toronto Transit Commission,
Mexico,
Joined Sep 2014
7
17:35 Jan-23-2017
Re: The impact of removing excess welding metal
In Reply to Tariq at 15:00 Jan-18-2017 (Opening).

Hi Tariq,

Here Engineering ordered do not touch the Crown in order to "increase" the life for a structure under cyclic load....the main issua is lack of penetration and lack of fusión at the root...and the results shows that the structure will have 30 years guaranty ...

 
 Reply 
 

Product Spotlight

NOVO Armor 15 & NOVO Armor 22

The Armor Kit Contains the NOVO Armor, which provides additional mechanical protection to the NOVO 1
...
5WN & NOVO 22WN Detectors, the Armor Stand and a traveling soft cover. - Newest shock absorbent technology case - Water resistant design - Supports wired & wireless communication - Multiple positioning options - Tripod connection using the Built-in 1/4” threads - Simple Detector battery replacement
>

Customized Probes and Transducers

With a strong development department and our own piezocomposite production, we accompany you from th
...
e first product idea to serial production. Our scientists are continuously researching new methods in the field of ultrasonic measurement technology. The progress achieved enables us to offer you optimal solutions.
>

AIS229 - Multipurpose Real Time System

Latest standard & automatic real time system developed by Balteau. The AIS229 has been designed to
...
do series inspection in a wide variety of industry. Composed of a shielded cabinet, 5 axis manipulator, x-ray generator and tubehead from 160kV to 225kV, a fl at panel & much more, the AIS229 is most certainly one of the most multipurpose RTR system available on the market.
>

FAAST-PA! OEM Patented phased Array for high speed UT inspection

Multiangle, Multifocus, Multifrequency, Multibeam. Instead of stacking UT electronics and having m
...
any PA probes, FAAST-PA is able to transmit all delay laws within ONE single shot in Real time.
>