where expertise comes together - since 1996

Web's Largest Portal of Nondestructive Testing (NDT)
Open Access Database (Conference Proceedings, Articles, News), Exhibition, Forum, Network

All Forum Boards
Technical Discussions
Career Discussions
Job Offers
Job Seeks >
QC Inspecot(welding/painting/NDT)/ QC engineer
Classified Ads
About NDT.net
Articles & News

1381 views
05:23 Sep-29-2006
Avijit Dey
QC Inspecot(welding/painting/NDT)/ QC engineer
Job Location: Anywhere

CURRICULUM VITAE


PERSONAL DETAILS
Nationality : Indian
Date of Birth : 08th August 1966
Place of Abode : Kolkata, India
Contact No. : 00968-92822318 & 0091-9819468158.
Present Address : Poojadham,A wing,Vaishalinagar,Dahisar (E), Mumbai-400 068.
E-mail ID : avijitdey2004@rediffmail.com and avimom2002@yahoo.co.uk
Passport Details : A-9553187; Place Of Issue-Calcutta,
Date Of issue: 04-05-2001 Date of Expiry: 22-10-2010
EDUCATION
1987 – Bachelor in Science From Calcutta University.
1992 - Diploma in Mechanical Engineering from Calcutta Technical School, Govt. of
West Bengal .
LANGUAGE ABILITIES

Speaking Writing Reading
Bengali Fluent Excellent Excellent
Hindi Good
English Good Good Good

COMPUTER SKILLS
Knowledge of major MS Office software applications, including Word, Excel and PowerPoint. Also very familiar with E-mail communications and Internet connectivity.


PROFESSIONAL QUALIFICATIONS
1998 - Course for Diploma in Welding Technology from Jadavpur University , Kolkata.
2000 - ASNT-SNT-TC-1A Level II – RT-LPT-UT.
2002 - Certified Welding Inspector – CSWIP-Vol-3.1
2003 - Registered Welding Inspector From European Welding Federation.
2004 - International Institute of Welding Diploma.
2006 - Certified Senior Painting Inspector - CSWIP BGAS Gr.2 .

Training : HSE and H2S awareness and escape Training

Member of Indian Institute of Welding.
Member of Welding & Joining Society (WJS) of TWI, Membership No. 533533.

EQUIPMENT/COMMODITY SPECIALITIES
I have more than 13 years of experience in Quality control and Quality Assurance .Implementing the site and shop QA/QC activities , supervision of Quality Control Team, In process and final inspection of Pr. equipments and non Pr. Equipments, Painting activities, Hydrostatic & Pneumatic test for various pr. Equipments, Leak testing, welding activities, NDT, Hydro test Package, Coordinating with Third party NDT group. Field Experience in pipe lines / Gas & Oil separation Plant /Refinery / Power Plant and Preparation ITP, Vendor document approval , Factory inspection and Expediting of all Equipment / Commodities.

Inspection
Pressure Vessels, Process Column, Process Piping, Heat Exchangers, Boilers Piping
Drums, Structures, Steel Storage Tanks, Pumps, Valves, Steel Stack, Fittings, Fittings
Fire Equipments, Painting, Non-destructive Testing (NDT) / Mechanical Testing.
Pneumatic / Hydro Test ,Welding (WPS, PQR, WPQ preparation),Weld Visual
Positive Material Identification (PMI)

Expediting
All equipment/commodities.

CODES, STANDARDS AND SPECIFICATIONS
Experienced with the following codes, standards and specifications:
ASME ,API,AWS,ASTM,ANSI,SSPC,
ARAMCO, PDO and Shell Specification and Standards.

PROFESSIONAL WORK HISTORY:

I) VELOSI LLC OMAN , Seconded to PDO ( Petroleum Development Oman) – From 2006 August to Present (Multi Discipline Inspector)
Project : Off-Plot Delivery, EMC, Shut Down Contracts, South Oman
Responsibility :
>Assist Project Engineers, construction activities, i.e. mainly in welding, NDE, testing, coating & painting, welding procedures and welder qualifications, independent quality integrity verification and documentation (test packs & quality plans) reviews & approvals.
>Liaise with Project Engineers, Discipline Engineers, Vendors and Company Technical focal point on Purchase Order details to plan inspection visits.
>Monitor implementation of contractor’s quality plans, inspection plans, procedures and work instruction. Verify contractor’s record of calibration, inspection & test equipment,
>-Witnessing of welding procedures qualification tests to the Company’s specification including hydrostatic and PIG testing operations
>Witness welder’s qualification, issue respective cards and maintain qualification records
>Conduct routine surveillance, inspections on the activities involving welding, painting, materials, bend’s dimensional inspection etc. including witness/review NDE results and review of test packs and quality plans. Produce inspection reports to Project Engineer, >Witness and monitor PE liner fusion welding procedures and qualification of welders/operators and welding procedures
>Verify painting quality for below and above ground.
>Issue SIR (Site Inspection Report)/ NCR.
>Maintain Database and feedback on contractor’s performance.

II) Intertek Inspections& Testing services India Pvt. Ltd, UK based TPI Co. – From year August 2005 to July 2006 (Inspector/Expediter)
Selected list of Inspection and Expediting Assignments:
>Inspection various fabricated items, Inspection of Pipes, Valves & Earthing Materials, Heat Exchanger, Painting , Cable Trays, Pressure Vessel.
- Expediting of various equipments.
- Vendor Evolution.
- Factory Inspection and periodic Inspection on behalf of BIS ( Bureau of Indian Standard)
Project : ADPL Esser (Hazira,Gujarat)
Client : GSPL (Gujarat)
Items : Ductile Iron Pipes , API 5L coated Pipes
Scope : Visual and dimensional inspection, hydrostatic pressure testing, Mechanical tests , Coating Etc.
Project : ONGC G1 & GS 15 Field Development Project & Panna Development Project.
Client : ONGC ( Oil and Natural Gas Corporation Ltd.)
Items : Manual Ball Valves, Cable Trays, Heat Exchanger, Riser Clamp, Pumps, Motor, Fittings, Pressure Vessel, Hook Up & Hanger supports Etc.
Scope : Inspection & Expediting carried out on behalf of M/s. Clough Engineering Ltd, Australia.
Visual and dimensional inspection, Painting ,RT film interpretation, Performance test ,Hydrostatic test, , welding inspection including review of ITP/WPS/PQR/WPQ/MTR, witness and certification of welding procedures and welders qualification tests, witness of laboratory mechanical tests, inspection during fabrication such as bevel preparation, fit up, welding parameters monitoring, usage of approved electrodes, WPS, welders etc, final weld inspection, review of RT films and other NDT reports, monitoring welders rejection rate, review of PWHT reports and charts etc, Vendor Document verification etc.

III) Tecnimont ICB Pvt. Ltd , Mumbai ( Italy & India join Venture)- From 8th Dec.2003 to 30th June 2005
( Sr. Inspection Engineer & Expediter)
Selected List of Inspection and Expediting Assignments:

Projects :
• M/s.LNG Hazira port and Terminal Project, Surat - India. Owner – Shell (Royal Dutch Company).
>In process and final inspection of fabricated item of Air Cool Heat Exchanger (Duplex Stainless Steel) as per TEEMA Code. Document approval ,Witnessed of welder qualification test, RT film & LPT interpretation.
>HVAC System such as Ducting , Condensing Unit , Fire Damper, Diffuser, Humidifier, Motor Etc.
>Desalination Package such as Inspection & Expediting of Filter/Water Tank with Rubber lining inside, FRP Tank, Pump , Motor, Structural etc.
>Painting of Pressure Vessel & Structure.
>Cconversant with all aspects of Painting Inspection.
>Surface Preparation prior to painting such as Rust Grade, Surface Profile, Environments, Abrasive Type, Size. Etc as per SIS 55-00-59, SSPC & IS8502 . Carried out various type of test during and after painting such as MEK test, ,Cross Cut test, Hutch Test Etc.
> Fire Equipments such as CO2 / Fire Water Extinguisher, Foam Tank , Foam Nozzle Etc.
> Valves as per API 598.

Projects : M/S. Razi Petrochemical Co. Iran for Revamping Urea Plant # 2.

> In process and final inspection of fabricated item of Condenser (Dulpex Stainless Steel) as per TEEMA Code. Document approval ,RT film & LPT interpretation.
> Material Identification of API 5L Grade Piping ,358 Grade welded Pipes , ASTM Grade Pipes & Plates Etc.
> Conversant with all aspects of welding inspection.
>Preparation and implementation of welding procedures specification (WPS).
>Welder’s performance qualification (WPQ) according to ASME Sec. IX.

Projects : N.P.C.I.L. for Rajasthan & Kaiga Automic Power Project.
>In process inspection of Critical Item such as SS Sample Monitor Tube, Header & Filters
Final Inspection of MS Rigid Conduits.
>working as NPCIL Approved Inspector.
IV) Inma Steel Fabricators Co. Ltd (Al-Jubail, Saudi Arabia) - From 17Th July.2001 to 23 rd Sep. 2003
(QC Engineer).
• Projects : Ethane recovery project, Berry Gas Plant, Saudi Aramco.
250,000 Dia inch of pipe spooling in CS, CS-HIC, SS and LTCS Etc.
Pressure Vessel , Tank , Inlet Heater . Structural.
Client: M/s. Saudi Armco.
• Project: Qatif Gas Oil Separation Plant -1 Complex.
1200 Dia inch of Power Boiler Pipe Spooling (CS material) under M/s. CCC subcontract.
Client: M/s. Saudi Armco.
Selected List of Inspection
• In process Inspection of Fabricated Piping , welding of SMAW, GTAW (Manual and Semi auto.), SAW, FCAW (Semi & Auto) for Pressure Piping as per ANSI 31.3 and Drawing.
• Conversant with fabrication of different materials such as carbon Steel, Stainless Steel,
• Conversant with Non-destructive testing (RT, LPT, Leak testing).
• Conversant with all aspects of welding inspection.
 Preparation and implementation of welding procedures specification (WPS).
• Welder’s performance qualification (WPQ) according to ASME Sec. IX.
• Conversant with international codes such as ASME Sec. IX, Sec VIII, Div. I, II, Sec V, API 650, API 620, API 1104, ANSI B31.3, TEEMA, AWS D-1.1, etc.
• Conversant with all aspects of Painting Inspection.
 Surface Preparation prior to painting such as Rust Grade, Surface Profile, Environments, Abrasive Type, Size. Etc.
 Carried out various type of test during and after painting.
• Familiar with the preparation of “Inspection and Test Plan” (ITP), QC documentation
• Familiar with ISO 9001-2000 requirements.
• Familiar with welding economy and productivity.
V ) India Tube Mills & Metal Industries Ltd , Mumbai - From 17Th March 1999 to June 2001

(QA/QC Engineer).
Selected List of Inspection : (Cont.)
• Projects : Jamnagar Refinery, Phase-II.
2 Nos. 48 M dia, 20 M Ht. Floating Roof.
Client: M/s. Reliance Petroleum Ltd.
• Project: Dabhol Power Project – Phase-II.
4 Nos. Steel Stack, 6.5M dia, 98.3M Ht., and 7 nos. different Dia and Ht. Floating roof and Fixed roof tanks.
Client: M/s. Enron Power Co. (USA) , Consultant : M/s. Bechtel International Inc.
• In process and final inspection of API Coded Storage tanks, Steel stack.
• Erection of Steel Storage Tank.
• Make Welding Procedure Specifications (WPS), Carried out Welder Qualification Test.
• Co-coordinating with customer representatives, 3rd party inspectors, and external agencies as inspection point & liaison work.
• Interpretation of RT Films of making the report of Non-Destructive testing.
• Preparing NDE documents for external agencies.
 Inspection & Co-ordination by NDT method such as RT, PT
• Conversant with fabrication of different materials such as carbon Steel, Stainless Steel, Nickel.
• Conversant with international codes such as ASME Sec. IX, Sec V, API 650, API 620, AWS D-1.1, IS-6533 etc.
• Familiar with the preparation of “Inspection and Test Plan” (ITP), QC documentation
• Familiar with ISO 9001-2000 requirements.
Also has experience in liaison with inspection agencies such as M/s.EIL, M/s.
Bechtel International Inc and M/s. REAL, etc.

VI) Alpha Beta Engineering Construction Pvt. Ltd , From January1997 to February 1999.)
QA/QC Engineer.
• Project: Additional Tank age project, Vizag Refinery,
5 Nos. 50 M dia, 17.4M Ht. Floating Roof, 2 Nos. 40M Dia, 14M Ht, Fixed Roof.
Client: M/s. HPCL.
M/S. Haldia petrochemical Ltd., Haldia, West Bengal.
Selected List of Inspection
• In process and final inspection of fabricated items such as Steel storage tanks as per API 650.
• To handle weld joint preparations, Fit-ups, as per Specifications & Drawings
• Make Welding Procedure Specifications (WPS).Co-coordinating with the client/consultants.
• Interpretation of RT Films of making the report of Non-Destructive testing.
• Hydro testing of the Steel Storage Tank.
• Conversant with all aspects of welding inspection.
 Preparation and implementation of welding procedures specification (WPS).
 Welder’s performance qualification (WPQ) according to ASME Sec. IX.
Familiar with the preparation of “Inspection and Test Plan” (ITP), QC documentation
VII) India Tube Mills & Metal Industries Ltd , Mumbai - From February 1996 to Nov 1996

( QC Engineer –Welding)
Work Site: Numaligarh Refinery Ltd. Numaligarh, Assam.
2 Nos. 79 M dia, 17.4M Ht. Floating Roof Tank.
Client: M/s. HPCL.
Selected List of Inspection
• Conversant with all aspects of welding inspection.
 Preparation and implementation of welding procedures specification (WPS).
 Welder’s performance qualification (WPQ) according to ASME Sec. IX. to handle weld joint preparations, Fit-ups, as per Specifications & Drawings. Carried out LPT of the Weld root & Final Joints and interpretation.
 RT Film interpretation as per ASME Sec. V. Conversant with Non-destructive testing (RT, LPT,
 Leak testing)
VIII) Texmaco Ltd .WestBengal From May 1993 to January 1996 ( Supervisor)
Manufacturer of Pressure vessel, Railway wagon and Structural job.
Selected List of Inspection
• To handle various types of weld joint preparations, Fit-ups, as per Specifications & Drawings.
• Familiar with & understand fundamental of the following processes. SMAW,MIG,
• SAW, GTAW Etc.
• Preparation and Assembly of Shell Course along with Dish End .
• Preparation & Marking, Cutting of Plate for making Shell & Dish Formed.
• Dimension & Measurement of Pressure Vessel as per ASME Sec. VIII.
Carried out PT of weld joints. Carried out the Hydro test of Pr. Vessel



    
 


© NDT.net - The Web's Largest Portal of Nondestructive Testing (NDT) ISSN 1435-4934

Open Access Database, |Conference Proceedings| |Articles| |News| |Exhibition| |Forum| |Professional Network|