where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -
498 views
Job Seeks
MAZHAR RAUF
MAZHAR RAUF
02:07 Oct-04-2007
Welding/Mechanical inspector

Job Location: Middle East

Dear sir,
I am sending my cv , Find here attached,
Please reply me soon.
MAZHAR RAUF
Mobile # 0092-3333631348
HJome # 0092-21-4243321

QA/QC INSPECTOR (MECHANICAL/WELDING)


MAZHAR RAUF A-1648 -Gulshan-e-Hadeed,Bin Qasim;
Phase II -Karachi 49-PAKISTAN
Email Id mrauuf@yahoo.com
Mobile No-0092-333-3631348
Res.Tel No-0092-21-4243321
----------------------------------------------------------------------------------------------------------------------------------

Education &Technical Qualification:

§ Diploma of Associate Engineer (Mechanical/Welding Technology)

§ Diploma of European Welding Inspection Practitioner (EWF)
§ Registered Welding Inspector- Number.2606 (TWI)

§ Certified Welding Inspector CSWIP-3.1 (Valid up to 2012)

§ Certified ASNT Level II in PT/MT/RT

§ Approved Welding/Mechanical Inspector from S.Aramco (SAP# 70005681)

In house Training/course-Jotun Paint(Pre-treatment and application)

Career Objective: Continuous learning and keeping abreast of latest technological developments.keeping track of the standard philosophies followed in various industries.To utilize my skills and strengths for the benefit of the employer.

Personal Detail:
Date of birth : 23/2/1958
Marital Status : Married
Nationality : Pakistani
Driving license : UAE (Dubai)
Professional Experience: More than 25 years experience in inspection of welding visual, dimensional, pressure component, piping, tanks & heavy structure(Bridges)
I have worked with several reputed construction companies in U.A.E, Qatar & Saudi Arabia.
Conversant with international code/standards like,ASME sec.IX, ASME sec.VIII, ASME sec.II, ASME B 31.3, API 1102, API 1104, API 650, API 620, API 653 & AWS D1.1.
Through knowledge in SMAW,GTAW,GMAW,FCAW,ESW,SAW and cutting related processes.
Page 1 of 3

Company : Olayan Descon Engineering Company K.S.A.

Project :Khursaniyah Producing Facilities.(Snamprogetti &S.Aramco)

Position : QA/QC Inspector (Mechanical &Welding) for tanks erection.(API 650 & 620)

Duration : August 2006 to August 2007

Company : Olayan Descon Engineering Company K.S.A.

Position :QA/QC Inspector (Mechanical &Welding)

Duration : October 2004 to 2005

Projects : Dahran Additional Facilities of Storage Tanks (S.Aramco)

Company : Olayan Descon Engineering Company K.S.A.

Position :QA/QC Inspector (Mechanical &Welding)

Duration : October 2002 to 2004 :> (WORK SHOP IN JUBAIL INDUSTRIAL CITY)

Responsibilities *Welding Inspection including weld fitup.
*Monitoring during welding verification of pre-heat/inter pass temp/heat in put etc.
*Stage inspection &Final inspection before PWHT or Hydro Test.
*Welder qualification as per ASME sec IX.
*Control of welding consumable.
*Monitoring welder performance.
*Compliance work with WPS.
*Dimensions Inspection.
*Evaluation of Test Results & reports.
*RT film interpretation.
*Co-ordination with Client & third party.
*Witness of NDE related activities.
*Development of new WPS.
*Documentation.

Company :Samsung Corporation Engineering Group

Position :QA/QC Inspector (Mechanical &Welding)

Duration :September 2000 to 2002

Project :Khuff Gas pipeline replacement project for QGPC-QATAR
Cross Country pipeline 36” dia 4Nos Stations – 2” dia to 30”dia.


Page 2 of 3
Company :Global NDE Services

Position : NDE Inspector.

Duration : 1999 to 2000

Responsibility : Welding and Radiographic inspection. :Cleveland Bridge & Engineering Pvt. Ltd.Dubai-UAE.

Position : QC Welding Inspector (Supervisor)

Duration : 1981 to 1998

Projects
· Ghazlan Desalination Plant (Saudi Arabia)
· Dubai Aluminum-DUBAL (Dubai)
· Jam Nagir Oil Field -Pile Cap (India)
· Lonto Higma Bridge (Hong Kong)
· Habco Power Plant (Pakistan)
· Dubai Gas Complex-DUGAS (Dubai)
· Ruwais Oil Refinery (Abu Dhabi)
· Sabia Power Station (Kuwait)
· Aluminum of Bahrain-ALBA (Bahrain)
· Khartoum Power Plant (Sudan)
· Sultan Qaboos Sea port (Sultanate of Oman)

Responsibilities
Ø Monitoring the capability of each welder on the basis of Radiographic Reports.
Ø Checking all welding activities is in compliance with the applicable code,standards and specification.
Ø Monitoring & witness of WPS/PQR /WQT/PT/MT/HT/PMI
Ø Co-ordination with Third party as well as client related to welding and NDE.
Ø Review of mill certificates,consumable MTC,calibration certificates of equipments.
Ø Checking that only approved electrode,wire and gas are used.
Ø Randomly checking welding parameters according to approved WPS(Ampere,voltage,Travel speed and Gas flow rate)
Ø Initiate DCR/NCR and following for correction as required.
Ø Checking the adequacy of the heat treatment technique and the record diagram.
Ø After completion of final testing, preparing all documents and submitting it to the Client.


Yours sincerely,
MAZHAR RAUF

Page 3 of 3


 
 

Product Spotlight

Echomac® Small

Available with up to eight channels of electronics to detect and evaluate thickness, flaws and eccen
...
tricity, this UT tester is housed in a convenient, smaller cabinet. This instrument can be used in conjunction with bubbler or immersion tank systems, or with a test bench or in laboratory applications. The Echomac® Small is available in the FD4, FD6 or FD6A versions.
>

Silverwing RMS PA - Phased-array corrosion mapping

Eddyfi Technologies integrated two market leading solutions, Silverwing’s RMS and M2M’s instru
...
ments to provide a high-speed, remote access ultrasonic phased-array inspection system with live total focusing method (TFM).
>

High-end Ultrasonic Flaw Detector with 32:128PR PAUT and 2-ch TOFD: SyncScan 2

SIUI’s newly launched SyncScan 2, is a high-end ultrasonic flaw detector with 32:128PR PAUT and
...
2-ch TOFD, which can maximize your efficiency for PA and TOFD. ● Support PA/TOFD/UT ● 32-ch PA is more suitable for inspection on extra-thick wall and high-attenuation material. ● 32-ch PA and 2-ch TOFD work simultaneously. ● Support PR mode for corrosion inspection.
>

IRIS 9000Plus - Introducing the next generation of heat exchanger inspection.

Representing the seventh generation of the IRIS system, the IRIS 9000 Plus has nearly 200 years of c
...
ombined field inspection experience incorporated in its design. This experience combined with a strong commitment to quality and a history of innovation has made Iris Inspection Services® the undisputed leader in IRIS technology.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window