Regarding NCR

Hi..
Who will fill in NCR , Root cause and corrective action . Quality ,or Production for any NC

    
 
 
Ed T.
Ed T.
02:51 Mar-27-2009
Re: Regarding NCR
In Reply to Slimmoon at 17:13 Mar-26-2009 (Opening).

In my opinion, the NCR should be filled out by the organization's QA/QC Manager or his representative that received the NCR.
It should then be reviewed after corrective action has been performed by the NCR originator and if satisfied, closed out.

    
 
 
K.Durga Rao
Consultant, - General Manager (Technical)
Asia Power Projects Pvt Ltd, India, Joined May 2009, 3

K.Durga Rao

Consultant, - General Manager (Technical)
Asia Power Projects Pvt Ltd,
India,
Joined May 2009
3
12:29 Mar-27-2009
Re: Regarding NCR
In Reply to Slimmoon at 17:13 Mar-26-2009 (Opening).

In my view it can be done in two ways; (a) If the non conformity was noticed by production department during manufacture of the goods before it was offered for inspection checks, head of that production section had to raise an NCR and that NCR had to be countersigned by the respective quality control engineer of that section. After the non conformity was attended by the production department, this had to be once again countersigned by the respective quality control engineer confirming the conformity and finally this NCR had to be closed by the management reprasentative of Quality control department. (b) If the non-conformity was noticed by the quality control engineer during his inspection, the NCR had to be raised by that quality control engineer and it had to be countersigned by the production dapartment head. Once this non coformity was resolved, the same quality control engineer had to countersign the NCR confirming the conformity and it had to be closed by the management reprasentative of Quality control department.

    
 
 
S.V.Swamy
Engineering, - Material Testing Inspection & Quality Control
Retired from Nuclear Fuel Complex , India, Joined Feb 2001, 787

S.V.Swamy

Engineering, - Material Testing Inspection & Quality Control
Retired from Nuclear Fuel Complex ,
India,
Joined Feb 2001
787
03:45 Mar-28-2009
Re: Regarding NCR
In Reply to K.Durga Rao at 12:29 Mar-27-2009 .

Dear Durga Rao garu,

Very good advice. Both production and QA/QC are to be involved at all stages of NCR resolution.

Swamy
QA and NDT Expert

    
 
 
Abbas Bombaywala
NDT Inspector
Free Lance, India, Joined Jul 2007, 91

Abbas Bombaywala

NDT Inspector
Free Lance,
India,
Joined Jul 2007
91
06:54 Mar-29-2009
Re: Regarding NCR
In Reply to Slimmoon at 17:13 Mar-26-2009 (Opening).

Hi Dear All

I Think Design department should also be involved there should be also comments and signature from Design Department that whether it is accepted or if it is affecting some change in Design part of view then he will raise a DCR to client and upon client acceptance of that DCR the NCR will be closed.

With Regards.
Abbas Zoher

    
 
 

Product Spotlight

Navic - Steerable Modular Automated Scanner

The Navic is a modular, motorized, steerable scanner designed to carry multiple attachments used
...
in various scanning and inspection applications. The Navic is capable of weld scanning (girth welds and long seam welds), automated corrosion mapping, and tank scanning.
>

Echomac® Small

Available with up to eight channels of electronics to detect and evaluate thickness, flaws and eccen
...
tricity, this UT tester is housed in a convenient, smaller cabinet. This instrument can be used in conjunction with bubbler or immersion tank systems, or with a test bench or in laboratory applications. The Echomac® Small is available in the FD4, FD6 or FD6A versions.
>

NEW Wheel Type Phased Array Probe

DOPPLER NEW Wheel Type Phased Array Probe, more stable, new tyre makes lesser acoustic attenuation
...
, much lighter makes easier to handle, more slim size, magnetic and mechanical encoder optional etc...more
>

Combination of Digital Image Correlation and Thermographic Measurements

The combination of measuring results from the digital image correlation (ARAMIS, DIC) and temperat
...
ure measuring data from infrared cameras permits the simultaneous analysis of the thermal and mechanical behavior of test specimens in the materials and components testing field.
>

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window