where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -

IMASONIC SAS
IMASONIC offers custom solutions for single to serial productions of ultrasonic transducers for NDT including phased array.
ProfileColleagues Albums -1/1BlogNews
capelle nicolas

... Seeking Job
... is Male, is married, has 3 childreen

... Seeking Job
... is Male, is married, has 3 childreen

Send Email
(you must login)

invite
(you must login)

Address:8 bis allée de l'auvergne
City:labenne ocean
Country:France
Email Address:
Institution:international

Languages:English french
Work in or as:NDT Inspector,
Main Method or Other:NDT Wide, PT, UT, VT/OT,
Certifications:UT Level 2 EN 473 PT Level 2 EN 473
Organizations:Web Site WWW.NDT-WELDING-INSPECTION.COM Secondairel : Euromed Management and Finance, Marseille 1997 Industrial Mechanical Systems Management, Marseille1995 BTS Industrial Maintenance, Marseille 1992 IWT Course completed, Paris 2011 UT2-PT2- EN473 Cofrend : B02-015003
NDT Suppliers:Olympus NDT EPOOCH 600

Financial Management
- Overall site accountancy
- Preparation and follow up of budgets, materials and investments.
- Control of costs and profit margins.
- Contract management of sub-contractors.

Administration and Personnel Management (HR)
- Management of staffing levels, recruitment and grading of personnel.
- General works management.
- Purchasing of stock, building materials and spare parts.

Commercial Management
- Negotiation and preparation of contracts.
- Customer courtesy visits and after sales services.
- Client reception and relations between head office and production department.

Technical Management
- Follow up of ongoing work on site and in the workshops.
- Quality control and verification of conformity to established standards.
- Setting up of maintenance services.
- Inspection and verification of goods received.

On site Management
- Coordination of the construction companies involved.
- Sign off of completed construction items.
- Control of budget and construction costs.
- Overall construction planning and scheduling.
- Follow up and sign off of sub-contractors works.
- NDT control UT2 PT2


Companies – Post-occupied Construction Site Work Force Management

2005 - 2006 ALSTOM – POWER (Technical Manager)

Complete Revamp of a 475T/H of steam at 180 bars in ABU QIR, EGYPT.
I supervised the team’s fitters/welders, consisting of mechanical and pipe fitters and I provided technical assistance and coordinated the teams.

2006 - 2007 ALSTOM (Technical Manager)
Construction of a cement production factory; capacity 1.300 tons/day in CHANDIAGARH.
I was in charge of the supervision and overall coordination and management of assembly operations.

2007 - 2008 M T C ENGINEERING (Project Manager)

Erection of a boiler for steam production of 600 T/H in SIKDA for Sonatrach, ALGERIA.
I performed the inspection and verification of mechanical work and piping, including materials and equipment (rotary and static charges). I ensured that the aid assembly, installation, testing and commissioning of mechanical equipment and systems was carried out. I was in charge of monitoring the assembly teams, security and adherence to International Quality Standards.

2009 – 2010 M T C ENGINEERING (Project Manager)

Erection of a black liquor boiler of 150 T/H steam in KASSERINE for SNCPA, TUNISIA
I was responsible for the supervision and overall coordination and management of assembly operations and the use of scaffolding. I guaranteed compliance with safety standards, quality and design, specifications, schedules and costs. I also performed the maintenance management for Oppers Global.

2010 – Aug 2011 ATW Worldwide Inspection

NDE for Alstom (ABUQIR, EG/Cordemais, FR/Norjiland, DK).
Pre-fab. Supervised QC on Oger International Item (Metallic structure).In Saudi Arabia, NDE Training and aided ATW Certification for Boiler and Ecolien Item.

Aug 2011 – 03/2012 VALE.NC (IS)
NDT & Welding Inspection (Goro Nickel Project New Caledonia) (IS).PT2-UT2 Hardness. PMI Coordination and Management off NDT Team.
(william.bullock@vale.com) Director

April 2012 - / / 05/2012 Vinci Contruction
Video control, ultrasonic testing off Portuiare Zone.


My Communications
  • 0033652773601 | OFFICE


    Profile created 2012-May-26, updated 2012-May-26, Login to Edit

    Share...
    We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
    Accept
    top
    this is debug window
    s