where expertise comes together - since 1996

Web's Largest Portal of Nondestructive Testing (NDT)
Open Access Database (Conference Proceedings, Articles, News), Exhibition, Forum, Network

    capelle nicolas

    invite
    ProfileAlbums (1/1)BlogNews Feed
    ... Seeking Job

    ... is Male, is married, has 3 childreen

    Address:8 bis allée de l'auvergne
    City:labenne ocean
    Country:France
    Email Address:
    Institution:international

    Languages:English french
    Work in or as:NDT Inspector,
    Main Method or Other:NDT Wide, PT, UT, VT/OT,
    Certifications:UT Level 2 EN 473 PT Level 2 EN 473
    Organizations:Web Site WWW.NDT-WELDING-INSPECTION.COM Secondairel : Euromed Management and Finance, Marseille 1997 Industrial Mechanical Systems Management, Marseille1995 BTS Industrial Maintenance, Marseille 1992 IWT Course completed, Paris 2011 UT2-PT2- EN473 Cofrend : B02-015003
    NDT Suppliers:Olympus NDT EPOOCH 600

    Financial Management
    - Overall site accountancy
    - Preparation and follow up of budgets, materials and investments.
    - Control of costs and profit margins.
    - Contract management of sub-contractors.

    Administration and Personnel Management (HR)
    - Management of staffing levels, recruitment and grading of personnel.
    - General works management.
    - Purchasing of stock, building materials and spare parts.

    Commercial Management
    - Negotiation and preparation of contracts.
    - Customer courtesy visits and after sales services.
    - Client reception and relations between head office and production department.

    Technical Management
    - Follow up of ongoing work on site and in the workshops.
    - Quality control and verification of conformity to established standards.
    - Setting up of maintenance services.
    - Inspection and verification of goods received.

    On site Management
    - Coordination of the construction companies involved.
    - Sign off of completed construction items.
    - Control of budget and construction costs.
    - Overall construction planning and scheduling.
    - Follow up and sign off of sub-contractors works.
    - NDT control UT2 PT2


    Companies – Post-occupied Construction Site Work Force Management

    2005 - 2006 ALSTOM – POWER (Technical Manager)

    Complete Revamp of a 475T/H of steam at 180 bars in ABU QIR, EGYPT.
    I supervised the team’s fitters/welders, consisting of mechanical and pipe fitters and I provided technical assistance and coordinated the teams.

    2006 - 2007 ALSTOM (Technical Manager)
    Construction of a cement production factory; capacity 1.300 tons/day in CHANDIAGARH.
    I was in charge of the supervision and overall coordination and management of assembly operations.

    2007 - 2008 M T C ENGINEERING (Project Manager)

    Erection of a boiler for steam production of 600 T/H in SIKDA for Sonatrach, ALGERIA.
    I performed the inspection and verification of mechanical work and piping, including materials and equipment (rotary and static charges). I ensured that the aid assembly, installation, testing and commissioning of mechanical equipment and systems was carried out. I was in charge of monitoring the assembly teams, security and adherence to International Quality Standards.

    2009 – 2010 M T C ENGINEERING (Project Manager)

    Erection of a black liquor boiler of 150 T/H steam in KASSERINE for SNCPA, TUNISIA
    I was responsible for the supervision and overall coordination and management of assembly operations and the use of scaffolding. I guaranteed compliance with safety standards, quality and design, specifications, schedules and costs. I also performed the maintenance management for Oppers Global.

    2010 – Aug 2011 ATW Worldwide Inspection

    NDE for Alstom (ABUQIR, EG/Cordemais, FR/Norjiland, DK).
    Pre-fab. Supervised QC on Oger International Item (Metallic structure).In Saudi Arabia, NDE Training and aided ATW Certification for Boiler and Ecolien Item.

    Aug 2011 – 03/2012 VALE.NC (IS)
    NDT & Welding Inspection (Goro Nickel Project New Caledonia) (IS).PT2-UT2 Hardness. PMI Coordination and Management off NDT Team.
    (william.bullock@vale.com) Director

    April 2012 - / / 05/2012 Vinci Contruction
    Video control, ultrasonic testing off Portuiare Zone.


    My Communications
  • 0033652773601 | OFFICE


    Profile created 2012-May-26, updated 2012-May-26, Login to Edit


© NDT.net - The Web's Largest Portal of Nondestructive Testing (NDT) ISSN 1435-4934

Open Access Database, |Conference Proceedings| |Articles| |News| |Exhibition| |Forum| |Professional Network|