where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -

ProfileColleagues Albums -2/3Blog News
Abdullah Nour El-Din Mahmoud

-Posted 1 Forum Messages here
...

-Posted 1 Forum Messages here
...

Send Email
(you must login)

invite
(you must login)

City:Alexandriah
Country:Egypt

Languages:English and Arabic
Work in or as:Engineering, QC Head at NEM ENERGY EGYPT
Main Method or Other:MT, PT, RT, UT, VT/OT, Other Methods, CWI
Certifications:Certified Welding Inspector (CWI )#15013951 , UT Level 2 ASNT , RT Level 2 ASNT ,VT Level 2 ASNT , MT Level 2 ASNT , PT Level 2 ASNT , Welding Metallurgy and Welding technology
NDT Suppliers:General Electric , Sonatest , Thermo scientific
NDT Equipments:USM Go , General Electric , Sonatest , Thermo scientific

1. Responsible for Post Weld Heat Treatment :
----------------------------------------------------------
1.1 Determine What need heat treatment or not from the isometric according to the Code Requirements and Client Specification
1.2 Review the Dimension of spool if it possible to put it inside the furnace or not “sometimes we fabricate the spools in two parts to put it into the furnace and after finish we make the last joint in this spool local ”
1.3 Make planning for the heat treatment what will be done local or furnace and discuss with the production to arrange it without any delay.
1.4 Review The Charts.


2. Responsible for Calibration :
---------------------------------------
2.1 Make Calibration for all welding machine.
2.2 Make Calibration for all Portable welding electrode oven and the main welding electrode oven.
2.3 Make annual planning for all equipment that needs to be calibrated “Internal and External”
2.4 Make Calibration Certificate for welding machine and Electrode Oven
2.4 Review all external calibration certificates


3. Responsible for Ultrasonic Test :
---------------------------------------------
3.1 Make Ultrasonic Test according to the Code Requirements and Client Specification ”UT Procedure”.
3.2 Determine if it possible to make scan or not according geometrical of the joint and make a sketch shows the
Details.
3.3 Fabricated Ultrasonic ASME Calibration Block according ASMEV
3.4 Prepare the joints that make by third party and Review Reports


4. Responsible for Hardness Test :
-----------------------------------------
4.1. Make hardness Test according to the Code Requirements and Client Specification


5. Responsible for PMI “Positive Material Identification” :
----------------------------------------------------------------------
5.1. Make PMI according to the Client Specification
5.2. Make PMI reports


6. Other :
---------------
6.1. Make Thickness Reports
6.2. Witness on PQR and take all reading “Amps-Volt-Travel Speed-Heat Input-number of passes” and ensure that the welder follow the proposal WPS
6.3 Make all NDT Reports and review all Reports and films for "RT"
6.4 Make Check Dimension and Visual Inspection According Isometric Drawing

WORK EXPERIENCE
-------------------------

2008- Present
---------------- QC Head Different Projects :
--------------------------------
1- Darling Down Power Station “Australia”
2- Kerawalapitiya Power Station “Srelanka”
3- Besos V Power Station “Spain”
4- Sidi Krir Power Station “Egypt”
5- Al-Atf Power Station “Egypt”
6- Noun Magnum Power Station “Netherlands”
7- Hemweg Power Station “Netherlands”
8- Denizli Power Station “Turkey”
9- El-segondo Power Station “USA”
10- Tamara Power Station “Venezuela”
11- Enecogen Power Station “Netherlands”
12- Bachaquero Power Station “Venezuela”
13- PP10 Power Station "KSA"
14- Panda Temple Poer Station “USA”
15- Panda Sherman Power Station “USA”


COMPUTER LITERACY
1- Windows XP/Vista/Windows7/ Windows8
2- MS office 2007-2010-2013
3- Internet
4- Photoshop
5- AutoCAD



Profile created 2013-Mar-28, updated 2015-May-23, Login to Edit

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window