where expertise comes together - since 1996 -

The Largest Open Access Portal of Nondestructive Testing (NDT)

Conference Proceedings, Articles, News, Exhibition, Forum, Network and more

where expertise comes together
- since 1996 -
ProfileColleagues AlbumsBlog News
SURYA NARAYAN BHAKAT

-Posted 3 Forum Messages here
...

-Posted 3 Forum Messages here
...

Send Email
(you must login)

invite
(you must login)

Address:BOREHAT, BURDWAN PIN-713102 WEST BENGAL.INDIA
City:
Country:India
Email Address:
Institution:JGEC

Work in or as:NDT Inspector, INSPECTION CO-ORDINATOR
Main Method or Other:RT, UT,

CURRICULUM - VITAE

01. NAME : SURYA NARAYAN BHAKAT
02. DATE OF BIRTH : 29th day of July 1964.
03. NATIONALITY : Indian
04. MARITAL STATUS : Married
05. PERMANENT ADDRESS : SURYA NARAYAN BHAKAT
BOREHAT, BURDWAN
PIN-713102 (W.B.)
INDIA
PHONE NO: -0342 2530571, 09933403118(M)
snbhakat29@yahoo.com
06. ADDRESS FOR COMMUNICATION: SURYA NARAYAN BHAKAT
BOREHAT, BURDWAN
PIN-713102 (W.B.)
INDIA
PHONE NO: -0342 2530571, 09933403118, snbhakat29@yahoo.com
07. COMPUTER KNOWLEDGE: Windows'2000, MS Office, Foxpro2.5/2.6, and AutoCAD, dBase V

08. EDUCATIONAL QUALIFICATION:

SL.NO. EXAM. PASSED YEAR OF PASSING % OF MARKS
01. B.E (MECHANICAL)
FROM NORTH BENGAL UNIVERSITY. August, 1988 69.32

09. OTHERS QUALIFICATION: - ASNT level II in RT & UT & CSWIP 3.1 COURSE ATTENDED
10. EMPLOYMENT DETAILS:
SL.NO. NAME OF ORGANISATION POSITION HELD PERIOD
1. TCI PVT.LTD CALCUTTA Jr. Engineer July 89 to July 90
2. WESTERN INDIA ENTERPRISES LTD. Asst. Engineer Aug.90 to Feb.94
3. ORMEC ENGINEERING LTD Asst. Engineer Apr.94 to Dec. 94
4. DEVELOPMENT INSPECTION SERVICES, CALCUTTA. Dy.Manager (Inspection) Jan. 95 to Aug’2002
5. Self employed from sept’2002 to july 2005 date in consultancy on inspection and welding at different fabrication shop around Burdwan and Howrah.
6. DEVELOPMENT INSPECTION SERVICES Dy.Manager (Inspection) July’2005 to Nov’2005
7. TATA PROJECTS LTD Sr. Surveyor Nov’2005 -continue
EXPERIENCE DETAILS: Work in the following Projects.

E TAT PROJECTS LTD,
Period: - Nov’2005 to till date
-Third party inspection of bought out item, tankage, pressure vessel etc at various vendor’s workshop/site.
--Inspection coordination, vendor evaluation, conducting internal quality audit.
At present posted at Kolkata for over all QS co-ordination in Eastern region.
D.1 HINDALCO Alumina plant Expansion project, Muri, Jharkhand
Deputed in Engineers India Limited.
Period: - July’2005 to Nov’2005
D.2 Reliance petrochemical Project, Jamnagar.
Deputed in RPL in QM department.
Period: - May’2002 to July’2002

D.3 Barauni Refinery Project,Barauni.
Deputed in Engineers India Limited.
Period: - Dec’1999 to Feb2002
Work doing: (a) working with Project Management team
(b) Review QAP & ITP,s for welding and NDT work for unit & offsite Piping ,Tanks, & Structure.
(c ) Review WPS and witness Procedure Qualification Test
(d) Witness Welder Performance Qualification Test and certify certificates
(e) Review Radiography films as per ANSI B31.3 and PWHT chart
(f) Periodically conducting technical Audit
.


D.4 Haldia Petrochemical Project,Haldia.
Deputed in Engineers India Limited.
Period: - March 1998 to Dec’1999
Work done: - Quality control activity of offsite piping & storage tank.
(a.) Review QAP & ITP
(b.) Review WPS and PQR as per ASME Sec IX, IS-7307.
(c.) Conducting Welder Qualification test as per approved WPS.
(d.) Review Radiography film as per ANSI B31.3, API-1104, API-650.
(e.) Daily site inspection such as Fit up, weld visual, DP, Vacuum test etc.
(f.) Exposure in ISO 9000 and Total quality Management.
D.5 LPG Recovery Project, USAR.
Deputed in Engineers India Limited.
Period - March 97 to Feb'98
Work done: -
(a.) Quality Control activity of process Unit piping and offsite piping.
(b.) Review WPS and PQR as per ASME Sec IX.
(c.) Conducting welder qualification test.
(d.) Review radiography film and PWHT as per ANSI B 31.3
D.6 Development Inspection Services, Calcutta.
Client: BRPL, TEIL.
Period: Jan’96 toFab’97.
Work done: Third party inspection work.
D.7 Mangalore refinery and petrochemicals Ltd., Mangalore.
Deputed in Toyo Engineering India Ltd.,
Period: Jan’95 to March’96
Work done:-
Quality control activity of process piping,stack & structural work.
Identification of piping materials like A106Gr.B, API5LGr.B, TP304, TP304Letc.
Review QAP& ITP as per standard and specification,
Review welding procedure specifications as per ASME sec. IX.
Conducting procedure qualification and welder qualification as per approved WPS.
Review Radiography film and PWHT chart as per ANSI B31.3.
C Diamond cement Ltd., Damoh,M.P
Period: April’94 to Dec.’94
Quality control activity of ESP,
Review WPS & conducting procedure and welder qualification test as per approved WPS.
Carry out site inspection
B National Thermal Power Project (GANDHAR & FARAKKA)
Client: - Ansaldo, Italy & Kawasaki Heavy Industries Ltd., Japan.
Period: - August 1990 to February 1994.
Work done: -
(a.) Quality Control Activity of ESP (500MW) Duct Support, Stack etc.
(b.) Conducting Welder Qualification Test.
(c.) Prepared Welding Procedure Specification.
(d.) Review Radiography Film.
(e.) Controlling welding consumable & Monitoring Welding activity.
A NTPC (FARAKKA)
Period: - July 1989 to July 1990
Work done: -
(a.) Fabrication supervision of 275 Mtrs. TWIN FLOW Chimney SHELL & Slip form Top Structure.
(b.) Welding supervision & Inspection.
(c.) Controlling Welding Activity.

12. PASSPORT NO.: - F8396577 Valid up to 08/08/2016
All the above statements are true, correct & completed to the best of my knowledge and belief.



SURYA NARAYAN BHAKAT



Profile created 2008-Jul-24, Login to Edit

Share...
We use technical and analytics cookies to ensure that we will give you the best experience of our website - More Info
Accept
top
this is debug window